Impact of Photovoltaic and Battery Energy Storage System Integration on the Performance of the Libyan 30 kV Distribution Network
DOI:
https://doi.org/10.65421/jibas.v2i4.281Keywords:
Garabulli Distribution Network, Western Libya, NEPLAN Model, Battery DischargedAbstract
The Garabulli distribution network in western Libya experiences low bus voltages, overloaded feeders and transformers, and high power losses during peak demand. This study examines whether photovoltaic (PV) generation and battery energy storage can relieve these constraints during normal operation and following a transformer outage. Using recorded peak-load data, a NEPLAN model and a loss-minimizing optimal power flow formulation were used to assess PV and storage placement and sizing. The analysis compared the base case with daytime operation, when PV supplied the network and the battery charged, and nighttime operation, when the battery discharged to support demand. Under normal operating conditions, PV and storage brought bus voltages within the prescribed limits, relieved equipment overloads, and reduced active and reactive power losses. Under the simulated transformer outage, the combined system reduced loading on the remaining transformer and maintained acceptable bus voltages. The results indicate that coordinated PV and battery operation can ease peak loading and improve voltage performance even when solar generation is unavailable, provided sufficient battery energy is available.